Cosmochute's $1.5M Bet: A Standard Trailer for the Moon
Cosmochute raised a $1.5M pre-seed to build reusable lunar surface infrastructure: a modular rover, a towable trailer and standardised payload bays. No hardware has flown yet.
Discover the cutting-edge launch systems, orbital infrastructure, and commercial space innovations expanding humanity's footprint and building the new space economy.
Cosmochute raised a $1.5M pre-seed to build reusable lunar surface infrastructure: a modular rover, a towable trailer and standardised payload bays. No hardware has flown yet.
Katalyst built LINK in nine months for a $30M NASA rescue. An attitude-control fault forced NASA to drop the boost, but the spacecraft closed to 12-15 km of Swift and returned data that now feeds NEXUS and four follow-on missions.
Reflect Orbital wants to sell sunlight after dark. It just bought two Indian rockets to start, against an FCC licence for one demonstration satellite and a roadmap that ends with more than 50,000 orbital mirrors.
Blue Origin opened its cap table for the first time in 26 years, raising $10 billion near a $140 billion valuation. The same week, it committed $550 million to Constellation Park, a 1.3-million-square-foot satellite factory in Hutto, Texas, built to mass-produce TeraWave and Quartz hardware.
A welding demo on a 2027 Momentus mission is small on its own. It is also the tool every serious orbital construction plan depends on, and the economics around it still do not close.
Helogen's HEL-IOS autonomous factory flies its first two complete missions in October 2026, carrying a UCL bone substitute and a LambdaVision retina protein. The technical case for microgravity manufacturing is strong; the economics are the hard part.
CSG's $434 million stake in MDA Space makes the Czech ammunition group the Canadian satellite maker's largest single shareholder. It is a small position with a large signal: European defence capital is buying its way into orbit, one option at a time.
Redwire has now been booked twice for Axiom Station's solar arrays - once for the module in final assembly in Turin, once for the module behind it. That is the commercial station story shifting from financing to procurement, and it happened without a single disclosed number.