Launch used to be the part of the space business you could simply buy. By late 2026 it has become the part you cannot.
SpaceX has told at least seven spacecraft companies that Falcon 9 is fully booked for all types of missions until 2028 or 2029, and it stopped taking rideshare reservations beyond late 2028 or early 2029 — the product that once let a startup reach orbit for a few hundred thousand dollars. On November 15, a United Launch Alliance Vulcan failed ten minutes after liftoff and destroyed 40 Amazon Leo satellites: the first outright mission failure in ULA's twenty-year history. The dependable, fungible ride to orbit is gone for anyone who has not already booked one. Into that gap stepped EnduroSat, which on November 25 reserved two dedicated Blue Origin New Glenn launches from Cape Canaveral — the first scheduled for 2029, the second undated and unpriced — capacity it will resell to the customers whose spacecraft it already builds. It is a smaller move than building a rocket. It may be the more instructive one, and it is no longer a lonely one. Our read: as launch turns from commodity into chokepoint, the better risk-adjusted bet sits with the companies that lock and bundle capacity, not the ones that try to own the pad.
The response is vertical integration: AST is building a rocket, ICEYE is bidding €2.05 billion for Avio, Rocket Lab is absorbing Iridium. None of the three is finished.
EnduroSat's contract-and-resell model is the asset-light middle path — cheaper to scale, but hostage to Blue Origin's cadence, which now points to an early-2027 return to flight.